- Resources
- Surgical splint (D5988)
Surgical splint (D5988): what to have on record
A complete chart for a surgical splint usually has current imaging and records for the planned surgery, a chart note that says what the surgery is and why a splint is needed, a narrative, and the lab invoice. The imaging, plan and consent come before treatment starts, the chart note during the visit, and the narrative and invoice before the claim goes out.
Surgical splint (D5988): A custom-made device that is made ahead of a planned surgery and used for it.
What to have on record
| Record | Why it matters | Best time to capture |
|---|---|---|
| Current surgical or diagnostic imaging and records that fit the planned surgery | Shows the case the splint is made for. | Before treatment starts |
| Signed treatment plan that lists the splint | Shows the patient agreed to the planned treatment. | Before treatment starts |
| Signed consent for the splint | Shows the patient was told what the treatment involves before it started. | Before treatment starts |
| Current medical history, reviewed at the visit | Shows the patient’s health was checked before treatment. | Before treatment starts |
| Chart note: the planned surgery, the diagnosis or defect, why a splint is needed, the design, impressions or scan, lab work, fit check, delivery, and instructions to the surgeon and the patient | Records why the splint was made and how it was checked. | During the visit |
| Narrative that names the planned surgery and why the splint is needed, with the date the splint was delivered | Pulls the clinical reasons together for whoever reviews the claim. | Before the claim goes out |
| Lab invoice and the surgical records | Shows the lab work and the case behind the splint. | Before the claim goes out |
Why timing matters
The imaging and records show the case before the splint is made, so they have to be current first. The narrative carries the delivery date, so it is written before the claim goes out.
How Shep helps
Shep reads your schedule and checks each visit against what the procedure needs on record. Shep tells your team the day before which of these a visit is missing.
Related
- Implant placement (D6010): what to have on record
- Mini implant placement (D6013): what to have on record
- Scaling and debridement of one implant with peri-implantitis, no flap (D6049): what to have on record
- All resources: what a practice needs on record
- See how Shep checks each appointment
Payers set their own requirements, so check each plan’s rules. This page is general information, not legal, coding or billing advice.
Spot a mistake? Email natasha@shep.dental.
CDT is a registered trademark of the American Dental Association.
Last updated: 28 October 2026